Luoning Public Sports and Fitness Center - Space Frame
30 Jan, 2026
Steel members and joints are prefabricated in the factory with high precision and easy quality control. On-site assembly of prefabricated units into the overall structure is performed using lifting equipment (such as truck cranes or tower cranes), resulting in a short construction cycle (typically over 30% shorter than concrete structures) and minimal impact on the surrounding environment.